Production

Low-batch resp. unit production of freight wagons ideally connects our welding jobs quality with freight wagons repairs and assembly experience. Individual and professional approach to every order has already satisfied many our business partners and at the same time it proved that the change from the repair workshop to new production of rail vehicles was successfully managed within the last ten years.


Reference orders:

  • narrow-track four-axle freight wagon for the containers transporatation incl. bogies LH 25 reconstruction to 1.000 mm  track– private railway Chemins de fer du Jura/ Switzerland
  • narrow-track four-axle freight flat wagon with low tilting walls incl. bogies LH 25 reconstruction to  1.000 mm track – private railway Chemins de fer du Jura/ Switzerland
  • bottom frame chassis production of tank wagons Zaens 62 m3, type Z03 incl. final top coat and wagon assembly (brake, tow bar, decking plant etc.) – Wagg-Markt Poprad s.r.o., final customer ERMEWA GmbH Hamburg