Reconstruction

Based on the tradition and repairs experience the company Krnovské opravny a strojírny s.r.o. offers also wagons modernizations and reconstructions according to the customer demands. 

Self technical solution of modernization and reconstruction is designed and provided according to the supplied resp. processed documentation by us in compliance with the valid regulations and rules incl. approval of vehicle type change by the rail authority of relevant country.

Reference orders:

Bogie 26-2.8 replacement by bogie DB 931 of tank wagons and Uacs wagons:                    

  • Českomoravský cement, a.s., nástupnická společnost
  • Hasit Velké Horažďovice, a.s.
  • AGC Flat Glass Czech a.s.
  • Rifest Liberec s.r.o.
  • Spolana Neratovice, a.s.


Bogie 26-2.8 reconstruction to type 9-876.0 for Uacs and  Hadgs wagons of 11th gr.:

  • Kotouč Štramberk spol. s r.o.
  • TransPlus(Česko) s.r.o. Prachovice
  • Lafarge cement Čížkovice, a.s.
  • České dráhy, a.s.


Construction change of Nas wagons 10th gr. superstructure to Slps wagon type 9-206.2:

  • OKD,Doprava,a.s.


Reconstruction of tank wagons boiler drain by Gestra EV30,Gestra EV 30 U valves installation:

  • Lovochemie Lovosice, a.s.
  • Spolana Neratovice, a.s.


Mounting of heating coils into boilers of tank wagons:

  • Transportservis Beroun, s.r.o.


Boilers insulation of tank wagons:

  • Spolana Neratovice, a.s.
  • VKS Praha, s.r.o.


Reconstruction of hooks for hauling rope at Fals-z wagons:

  • Českomoravský cement,a.s.,nástupnická společnost


Body reinforcement of Uacns 9-551.0 wagons:

  • Vápenka Čertovy schody, a.s.


Drain pipeline reconstruction of  Uacs 90 m3 wagons intended for transportation of filtred fly ash:

  • Wagg-Markt Poprad s.r.o. (final customer ERMEWA GmbH Hamburg)


Drain pipeline reconstruction of Uacs 95 m3 wagons for transportation of sugar:

  • Wagg-Markt Poprad s.r.o. (final customer ERMEWA GmbH Hamburg)